FederalTX
Posted
Jul 9, 2026
Oct 20, 2026
FMC Devens - Replace Boiler Burners (3) Project 26Z2BF8 RFP
The contractor shall be responsible for providing all engineering, labor, tools, rigging, materials, temporary bypass systems, and factory-authorized commissioning services necessary to replace and install the burner assemblies on three (3) 23,450,000 BTU/hr. (700 HP) high-pressure steam.
