CountyMN
Posted
Sep 4, 2026
Oct 30, 2026
Switchgear Controls Replacement - Request for Bid
To replace the original controls of the paralleling main switchboard.
Description: Replacement of existing stormwater conveyance and treatment/flow control system serving the Parkland Spanaway Library site, including removal and replacement of below-grade piping, structures, and appurtences; installation of new bioretention facility; associated site restoration; asphalt and concrete paving; and parking lot re-striping.
Library · WA, US
Solicitation files and supporting documents for this bid.
Adjacent opportunities open for bidding right now.
CountyMN
Posted
Sep 4, 2026
Oct 30, 2026
To replace the original controls of the paralleling main switchboard.
School DistrictMI
Posted
Oct 9, 2026
Nov 5, 2026
Work include roofing replacement.
CountyMN
Posted
Sep 4, 2026
Oct 30, 2026
To replace the original controls of the paralleling main switchboard.
CountyTN
Posted
Aug 20, 2026
Oct 22, 2026
Administration Building- Removal and disposal of (1) existing CHW pump. Provide (1) replacement pump of the same capacity along with new triple duty valve, suction diffuser, and butterfly valve. The contractor is responsible for identifying a like or better replacement and must provide justification for the selected unit. Draining, filling, and air bleeding of the piping system. Portland Library: Provide two (2) new 12.5-ton gas pack units equivalent to the existing unit currently installed at the Portland Library. The contractor is responsible for identifying a like or better replacement and must provide justification for the selected unit. Millersville Library: Provide two (2) new 10-ton gas pack units equivalent to the existing unit currently installed at the Millersville Library. The contractor is responsible for identifying a like or better replacement and must provide justification for the selected unit.
Decision makers connected to this RFP from Pierce County Library System.