Special DistrictMO
Posted
Sep 25, 2026
Oct 23, 2026
Description: Work consists of removal of existing 72,554 SY of asphalt pavement, base course as needed, and sections of sidewalk and curb. Installation of approx 1,787 LF of new 6" pvc c900 water main, including new service connections and fire hydrants. Construction of new pavement consisting of a structural section with 3" of asphalt concrete over existing or new aggregate base course (abc) as needed. All sidewalk and ramps will be replaced to comply with ADA standards.
City · AZ, US
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from City of Yuma.
Adjacent opportunities open for bidding right now.
Special DistrictMO
Posted
Sep 25, 2026
Oct 23, 2026
Project shall consist of preventative pavement maintenance for runway 16/34, taxiway a, the partial taxiway connectors located at the ends of the runways, and the apron. The preventative maintenance will include removal and replacement of all joint sealants for the areas mentioned. There will also be spall repair and slab replacement for any concrete panels where cracking or damage is observed. Any pavement markings that are damaged during construction will be replaced at no additional cost to the sponsor.
Rowan-Salisbury School District
School DistrictNC
Posted
Oct 6, 2026
Oct 28, 2026
Roof replacement.
Special DistrictTN
Posted
Oct 15, 2026
Oct 30, 2026
Work includes approx 6,500 LF of 8" C900 PVC water lines via excavation.
CityMA
Posted
Oct 14, 2026
Oct 29, 2026
River stabilization phase II.