Posted
Oct 5, 2026
Oct 26, 2026
Indian Springs Road and Clearwater Drive Pipe Replacement Project
Project consists of: replace existing 15" cmp, 18" cmp, 24" cmp, 36" cmp with new 18", 24" 36" hdpe pipes. Replace (20) existing type-c inlet structures with new in-kind structures. Replace (3) type 4 box with type c inlet top with new in-kind structures. Remove (1) type c inlet and replace with (1) type 4 box with type c inlet top - 4' concrete sidewalk ramp restoration - concrete sidewalk restoration - curb restoration - full depth pavement restoration. - final site stabilization.
